JT30 /JT30 All Terrain Operator’s Manual

Prepare - 84

Plan Bore Path

CMW

AT Cobble pipe

Minimum depth (D)

Entry pitch (A)

Setback (B)

Depth to begin steering (S)

4 ft 5 in (1.3 m)

18% / 10.2°

43 ft 5 in (13.2 m)

1 ft 1 in (0.33 m)

5 ft 4 in (1.6 m)

20% / 11.3°

47 ft 4 in (14.4 m)

1 ft 3 in (0.38 m)

6 ft 3 in (1.9 m)

22% / 12.4°

51 ft 3 in (15.6 m)

1 ft 4 in (0.41 m)

7 ft 3 in (2.2 m)

24% / 13.5°

55 ft 2 in (16.8 m)

1 ft 6 in (0.46 m)

8 ft 4 in (2.5 m)

26% / 14.6°

58 ft 11 in (18.0 m)

1 ft 7 in (0.48 m)

9 ft 6 in (2.9 m)

28% / 15.6°

62 ft 8 in (19.1 m)

1 ft 8 in (0.51 m)

10 ft 8 in (3.3 m)

30% / 16.7°

66 ft 5 in (20.2 m)

1 ft 10 in (0.56 m)

IMPORTANT: Numbers in table based on 210’ (53 m) minimum bend radius, beacon housing, EZ-
Connect, connector, transition sub, and 1/3 of first drill pipe (L, totaling 6’ 4” [2.6 m]) in the ground before
steering.