Jt30 /jt30 all terrain operator’s manual – Ditch Witch JT30AT User Manual

Page 96

Advertising
background image

JT30 /JT30 All Terrain Operator’s Manual

Transport - 96

Load

CMW

Procedure

Loop a transport chain around each tie down point. See chart below for correct distances between tiedown
ends. Make sure tiedowns are tight before transporting.

NOTICE:

Wrenches can open after engine shutdown. Ensure that any downhole tool or pipe in wrenches is
attached to spindle or removed before transport.

Use Grade 7-3/8” (18.7 cm) transport chain to secure drilling unit.

Note: If hauling unit without pipe box, remove remaining pipe in drill frame chute.

Distance

U.S.

Metric

A

12-45” 31-114

cm

B

12-45” 31-114

cm

C

less than 55”

less than 140 cm

Advertising
This manual is related to the following products: