Beacon housings, Jt30 /jt30 all terrain operator’s manual, Downhole tools – Ditch Witch JT30AT User Manual

Page 147: Installation, Lid installation

Advertising
background image

Systems and Equipment - 147

JT30 /JT30 All Terrain Operator’s Manual

Downhole Tools

CMW

Installation

Remove all paint from mating surfaces before attaching any bit to housing. Install screws (p/n 107-277)
and tighten bolts to 120 ft•lb (163 N•m).

Beacon Housings

Lid Installation

1.

Clean all threads, bolt holes and mating surfaces.

2.

Follow tightening sequence (shown).

3.

Use removable thread locker (Loctite

®

242 or

equivalent), if desired.

4.

Tighten bolts to 60-70 ft•lb (81-95 N•m).

5.

Repeat tightening sequence.

Soil

Description

sandy soil

sugar sand, blow sand, or other soils where sand is the predominant component

soft soil

sandy loam

medium soil

loams, loamy clays

hard soil

packed clays, gumbo, all compacted soils

rocky soil

chunk rock, glacial till, cobble, rip rap, gravel

soft rock

soft limestone, sandstone, shale, coral, caliche

hard rock

granite, schist, marble, hard limestone

5

5

5

5

j15om085h.eps

5

6

3

4

1

2

Advertising
This manual is related to the following products: