Add Single Pipe

1.

Ensure pipe box is positioned properly. See “Shift Pipe Box” on page 159.

2.

Move shuttles out half way (45°).

3.

Remove pipe guide (1) (shown in storage
position) from drill frame and insert in slot
on drill frame.

4.

Ensure backup bracket (4) on drill frame
allows pipe guide to align with front face
(5) on drill frame, adjust if necessary.

5.

Pull pin (3) from slot (A) on shuttle, rotate
auxiliary pipe loader (2) down, and install
pin in slot (B).

6.

Repeat step 5 for rear auxiliary pipe loader.

7.

Lower pipe lifters.

8.

Load a pipe in auxiliary pipe loaders with lower end resting against pipe guide (1).

9.

Step back from machine.

10. Move auxiliary shuttle in.

11. Raise pipe into column.

12. Move shuttle out (shuttle stop switch will stop shuttle movement at correct position for loading pipe).

13. Repeat steps 7-13 to load more pieces of pipe.

14. Close both auxiliary pipe loaders. Pins must be inserted in slot (A) and held in place with retaining pins.

If shuttle will not retract after completing single pipe operations, hold retract pipe shuttle switch and
momentarily press multi-use button to reset shuttles to normal operation (shuttles will retract).

Use standard procedure for pipeloader operation.

NOTICE: If loading more than one column full of pipe, start by filling an inside column, then
shift box inward and load pipe in the next empty column.

Crushing weight. If load falls or moves it could kill or crush you. Use

proper procedures and equipment or stay away.

Note: This step creates a temporary
shuttle stop position at 45°.