Jt30 /jt30 all terrain operator’s manual – Ditch Witch JT30AT User Manual

Page 157

Advertising
background image

Systems and Equipment - 157

JT30 /JT30 All Terrain Operator’s Manual

Pipeloader

CMW

Prepare

1.

Press pipe lift switch to fully raise first row of
pipe.

2.

Remove pins (1) and support bars (2) from
drill frame storage pockets.

3.

Insert each support bar (2) into opening (4)
and allow it to sit on chute (3) and retain with
pin (1) through tab (5).

4.

Press pipe lower switch to lower pipes in
chute.

Remove Pipe Box

1.

Remove support rods (1) from pipe box storage (2).

2.

Insert support rods into pipe supports (3) and retain with pins (4).

3.

Install lift block (5) and adjust to match drill frame angle.

4.

Remove threaded caps (6) from back pins.

5.

Remove front (7) pin.

6.

Move pipe box off of drill frame.

Advertising
This manual is related to the following products: