Wireline tracking, Jt30 /jt30 all terrain operator’s manual – Ditch Witch JT30AT User Manual

Page 166

Advertising
background image

JT30 /JT30 All Terrain Operator’s Manual

Systems and Equipment - 166

Wireline Tracking

CMW

Wireline Tracking

The Ditch Witch JT30 can be modified to operate a wireline tracking system by installing kit 190-1627.
Wireline tracking uses a transmitter in the drilling head that is hard wired through the drill string to an
offboard computer station at the rear of the unit. Each time pipe is added to the drill string, a new section of
wireline is inserted through the new pipe, gearbox, and water swivel, then spliced to the tracking system.
The operator must be aware of the wireline tracking specialist’s activity at the front and rear of the
machine.

IMPORTANT: This section is intended as an overview for the JT30 drilling unit operator. During most
bores, a wireline tracking specialist is responsible for making wireline connections. For specific
information about wireline tracking, including system operation and safety precautions, consult your
wireline tracking equipment vendor.

1.

Operator awareness zones

2.

Wireline

j34om013w.eps

1

2

Advertising
This manual is related to the following products: