Casella CEL CEL-440 User Manual

Page 46

Advertising
background image

Operation

Press

Display Shows

Comments

4. Move to

the list of

run Dates

for the

specified

bandwidth

and select

the

required

date

followed
by

or

This menu shows the dates

on which all runs with the

specified bandwidth were

saved (i.e. a specified

bandwith or all available

bandwidths).

5. Move to

the list of

Runs and

select a run

followed
by

or

This is a directory of all runs

stored on the specified date

with the required bandwidth.

6. View the

Header for

the

required

run

indicates that overload

has occurred during the run.

shows that a printer

is on-line.
To print a hard copy, go to

Step 7.

To view data from a

broadband run, go to

Step 11.

To view data from a narrow

band run, go to Step 12.

7. If required,

print a hard

copy of the

run data

Information from the run will

be printed as hard copy that

includes the following:

Header,

Calibration valid at start of

run,

Current calibration (see

Section 2.2),

Run data.

When a CEL-480 run with

multiple periods (or scans) is

being inspected, an

additional screen will be

displayed. Go to Step 8.

r-04

Tue

Thu

Wed 7 Jan1998

9 Jan1998

13 Jan1998

15 Jan1998

Fri

r-0

5

%MEM

14:37:Ø6

1

15 Jan1998

Ø8:59:27

1

11:Ø9:55

11:Ø9:55

1

12:45:Ø9

1

Tue

r-06

ØØ:ØØ:21

Type 1

Dur.
Preamp.
Range 2Ø - 9Ø
Factory Setup

r-06

ØØ:ØØ:21

Type 1

Dur.
Preamp.
Range 2Ø - 9Ø
Factory Setup

Page 46 - CEL-440/480 Operators Handbook

Operation

Advertising