BE1-87T Test Procedures

5-21

Table 5-9. Input Signals to Comparison Circuits Based On Jumper Positions

Jumper

Ain

Bin

Cin

WYE

I

A

I

B

I

C

Jumper

Ain

Bin

Cin

1

I

A

-I

C

I

B

-I

A

I

C

-I

B

2

I

A

-I

C

I

B

-I

C

I

C

-I

A


The following connections can be used to verify proper relay jumper positions on a three-phase unit or to

test an in-service relay without changing the jumpers. These tests only require two input current sources

(180° out of phase). In most cases, the specified input pair will properly test only two of the three phases

within the relay. In order to test all three of the relay phases, two of the three connection pairings should

be tested. This confirms relay operation.

Jumper Positions WYE-WYE

Step 1. Connect Input 1 current to terminals A and B.

Connect Input 2 current to terminals A and B.

This verifies the A- and B-phase differential circuits which respond together, as provided earlier

in the

Verification Tests: 5 Amp CT or Verification Tests: 1 Amp CT in this section. The C-

phase differential circuit sees no current and does not respond.

Step 2. Connect Input 1 current to terminals A and C.

Connect Input 2 current to terminals A and C.

This verifies the A- and C-phase differential circuits which respond together as provided earlier

in the

Verification Tests: 5 Amp CT or Verification Tests: 1 Amp CT

in this section. The B-

phase differential circuit sees no current and does not respond.

Step 3. Connect Input 1 current to terminals B and C.

Connect Input 2 current to terminals B and C.

This verifies the B- and C-phase differential circuits which respond together, as provided

earlier

in the

Verification Tests: 5 Amp CT or Verification Tests: 1 Amp CT

in this section. The A-

phase differential circuit sees no current and does not respond.

Jumper Positions WYE-1

Step 1. Connect Input 1 current to terminals A and B.

Connect Input 2 current to terminals A and N.

This verifies the A- and B-phase differential circuits which respond together, as provided

earlier

in the

Verification Tests: 5 Amp CT or Verification Tests: 1 Amp CT

in this section. The C-

phase differential circuit sees no current and does not respond.

Step 2. Connect Input 1 current to terminals A and C.

Connect Input 2 current to terminals N and C.