Current batch loads – Super Systems SD Recorder II User Manual
Page 46
Advertising
Super Systems Inc.
Page 46 of 50
SD Recorder II Operations Manual
Current Batch Loads
If you are logged in as a Supervisor or Operator (permission level 3 or higher),
an additional button Mark Load Completed is revealed. When the furnace
cycle is complete and the load is out of the furnace, click the Mark Load
Completed button. The load record TimeOut field will be completed, and the
load record will be transferred to the Load History records.
When you click on
the Current Batch
Loads tab you are
immediately
Presented with
the Current Loads
Screen. Everyone
can access this
screen.
The Sync to Chart button
opens the chart for the
selected furnace and
adjusts the chart start
time to correspond to
the time in value.
Advertising