Melsec-q, 15 troubleshooting – MITSUBISHI ELECTRIC Mitsubishi Programmable Logic Controller QD75D User Manual

Page 611

Advertising
background image

15 - 7

MELSEC-Q

15 TROUBLESHOOTING

Related buffer memory

address

Axis 1 Axis 2 Axis 3 Axis 4

Set range

(Setting with sequence program)

Remedy

—

—

—

—

—

—

—

—

—

—

—

• Check that there is no influence from noise.

• Check hardware for possibility of fault.

—

—

—

—

—

• Review the sequence program which turns ON/OFF

PLC READY signal (Y0).

• Cancel the error with an axis error reset.

(Refer to Section 15.1[3])

—

—

—

—

—

Check the drive unit power, wiring with the drive unit,
and connection of connectors, and cancel the error
with an axis error reset. (Refer to Section 15.1[3])

—

—

—

—

—

Check that there is no error on the personal computer
side I/F to which a cable is connected.

—

—

—

—

—

After making an axis error reset (refer to [3] in Section
15.1), perform manual control operation (refer to
Chapter 11) to move the axis to the other position in
order that the upper limit signal (FLS) will not turn OFF.

—

—

—

—

—

After making an axis error reset (refer to [3] in Section
15.1), perform manual control operation (refer to
Chapter 11) to move the axis to the other position in
order that the lower limit signal (RLS) will not turn OFF.

—

—

—

—

—

Check whether the stop commands (output
signals/external inputs to QD75) are turned ON or
OFF. Turn OFF the ON commands.

• Output signals to QD75

Axis 1: Y4, Axis 2: Y5, Axis 3: Y6, Axis 4: Y7

• External input

Connectors for external device connection:
Stop signals (STOP)

After confirming the stop command status, cancel the
error with an axis error reset. Then turn ON a start
signal. (Refer to Section 15.1[3])

—

—

—

—

—

Turn ON the PLC READY signal (Y0) with the BUSY
signals of all axes OFF.

78

228

378

528

<OPR retry>

0, 1

• Validate the OPR retry function

(set value: 1). (Refer to Section 12.1.1)

• Move the workpiece from the current position (on OP)

using the manual control operation (refer to Chapter
11), then carry out a machine OPR again.

Advertising