Evacuation (installation) – Panasonic CS-A9CKPG User Manual

Page 60

Advertising
background image

(No refrigerant in the refrigeration cycle)

1. Connect the vacuum pump to the charge set’s centre

hose.

2. Evacuation for approximately one hour.

Confirm that the gauge needle has moved toward -0.1
MPa (-76 cmHg) [vacuum of 4 mmHg or less.]

3. Close the valve (Low side) on the charge set, turn off

the vacuum pump, and confirm that the gauge needle
does not move (approximately 5 minutes after turning
off the vacuum pump).

4. Disconnect the charge hose from the vacuum pump.

Vacuum pump oil

If the vacuum pump oil becomes dirty or depleted,
replenish as needed.

12.1.5. Evacuation (Installation)

Procedure:

60

CS-A9CKPG CU-A9CKP6G / CS-A12CKPG CU-A12CKP6G

Advertising