4 laser peak current – Quantum Instruments Cascade Laser Starter Kit User Manual

Page 23

Advertising
background image

Starter Kit Instruction Manual

Description

22

Duty cycle calculation

UPI can be used to calculate the duty factor as
follows:

df =

2

U P I−ν

P low

ν

P high

−ν

P low

with v

P low

and v

P high

as above.

To get the real duty cycle, df must be corrected

as follows:

dc = f

LDD

df = f

LDD

2

U P I−ν

P low

ν

P high

−ν

P low

to compensate for systematic errors in the LDD100.

Actual value is f

LDD

= 1.1

4.6.4

Laser peak current

The laser peak current can be calculated by the
measurement of the current through the series re-
sistor Rs. This is provided by the values ULL and
UD, which are rectifier outputs. To correct for the
duty cycle, the rectifier values have to be taken into
account with the following formula for a correction
factor:

p = 1 +

Rds

Rcdc

where Rds and Rc are resistors in the rectifier

circuit, dc is the duty cycle calculated as in the
preceding paragraph. Actual values are Rds=10kΩ
and Rc=10MΩ.

The corrected values for the peak laser cathode

and transistor drain voltage are then given as fol-
lows:

U LL

peak

= pU LL + U ds

U D

peak

= pU D + U ds

where Uds is the voltage drop across the recti-

fier diode, actual value Uds=0.25V.

Finally, the laser peak current is then given by:

I

peak

=

U LL

peak

−U D

peak

Rs

where Rs is the series resistor, actual value Rs

=0.85Ω.

Advertising