Fig.17: connecting starter kit – Quantum Instruments Cascade Laser Starter Kit User Manual

Page 30

Advertising
background image

Starter Kit Instruction Manual

Installation

29

[3] Plug the cable (3) onto the LDD100(4).

[4] Plug the +12VDC connector (1) into the
TPG128 (9).

[5] Plug the trigger BNC connector (2) into
the TPG128 (9) Out 1 or Out 2 outptut.

CAUTION ! The unit must be floating.

[6] Plug the banana cables (8) (red and black)
into the DC power supply unit.

[7] Plug the LEMO connector (6) onto the
LLH100 module (5) and the connector (7) onto
the TCU151 unit.

[8] Plug the cooling water tubing if available.

CAUTION ! If no water cooling is avail-
able, pay attention to the LLH100 module case
temperature, and be careful of either reducing
heat dissipation or providing air cooling to the
unit.

TPG

128

−TT

L Pu

lse

Gen

erato

r

O

TCU151

FF

ON

Po

T

w

e

e

m

r

pera

ture

0

C

.

o

2

n

t

t

o

r

2

o

.

l

2

l

m

e

s

r

0.5

to

10.5

ms

5 to

105

m

s

0 to

200

ns

−−−

− −

−−−

−Pe

riod

−−−

−−−

−−−

−D

urati

on

Gate

IN

Trig

OU

T

Out

1

Out

2

50

ohm

s

50

ohm

s

50

ohm

s

max

60m

A

+12

V

0 V

connected to + hi High Voltage

Pulse on top, Bottom

Output

Current control Max 60V

Power supply 12V

Input

LDD 100

Monitor 20 A/V, Z50 Ohm

6

9

8

7

3

1

2

3

5

Fig.17: Connecting Starter Kit

Advertising