2 tcu151 temperature controller calibration, Starter kit instruction manual maintenance 46 – Quantum Instruments Cascade Laser Starter Kit User Manual

Page 47

Advertising
background image

Starter Kit Instruction Manual

Maintenance

46

8.4.2

TCU151 temperature controller
calibration

! WARNING ! Keep in mind that during
the calibration procedure, the instrument is
powered on.

Before beginning

[1] Power off the instrument.

[2] Open the TCU151 top cover (1) to access
the TCU151 main board (2).

Material needed

• Voltmeter HP3458A or equivalent.

• Voltage source Keithley SMU237 or equiva-

lent.

• Precision resistor 100 Ohm 1% or better.

• Cable: LEMO 6 poles female 6 bananas fe-

male (LEMO connector: LFGG.1B.306.CLAD72Z,
LEMO handler GMA.1B.065.DG).

Procedure

+5V/-5V power supply check.

CAUTION ! Do not connect the signal IN-34

V DC (connector J1 (3)).

[1] Check the input impedance between +5V/-
5V and GND

note: The values should be:

– TP1 (4) - GND (5): > 5 kΩ.

– TP2 (6) - GND (5): < 4 kΩ.

[2] Power on the instrument.

[3] Check the +5V/-5V power supply volt-
age.

Note: The values should be:

– TP1 (4) - GND (5): 4.95 to 5.2 V.

– TP2 (6) - GND (5): 4.95 to 5.2 V.

2

1

Tem

pera

ture

Con

trolle

r

Alarm

Res

et

Exte

rnal

Inte

rnal

Real

I

Real

C

Settin

g C

Settin

g +I

Settin

g −I

+

TCU151

Fig.37: Removing the top cover

3

6

5

4

Fig.38: TCU151 main board

Advertising