Section 2

Installation

2.1 Introduction

This section contains installation information, power requirements, initial inspection and signal connections for
Model 4033 and 4034.


2.2 Mechanical Inspection

This instrument was carefully inspected before shipment. Upon receipt inspect the instrument for damage that might
have occurred in transit. If there is damage due to shipping, file a claim with the carrier who transported the unit.
The shipping and packing material should be saved if reshipment is required. If the original container is not to be
used, then use a heavy carton box. Wrap the unit with plastic and place cardboard strips across the face for
protection. Use packing material around all sides of the container and seal it with tape bands. Mark the box
"FRAGILE".

2.3 Initial Inspection

After the mechanical inspection, verify the contents of the shipment (accessories). If the contents are incomplete, or
if the instrument does not pass the specification acceptance tests, notify the local service center. The unit is
calibrated and ready for use upon receipt. For a detailed performance check procedure, please see section 5 of the
manual.

2.4 Instrument Mounting

The model 4033 and 4034 programmable pulse generators are intended for bench use. The instrument includes a
front feet tilt mechanism for optimum panel viewing angle. The instrument does not require special cooling when
operated within conventional temperature limits. The unit can be installed in a closed rack or test station if proper air
flow is assured. A 5 cm minimum clearance must be provided at the rear of the unit for proper convection cooling.

2.5 Product Dimensions

300 mm