Ontrols, Ower, Ater – Hydrotech Precision-PWS 8-5 OWNERS GUIDE User Manual

Page 27: Verheat, Eset and, Controls, Operation

Advertising
background image

27









Controls

(A)

(B)

(C)

Operation Switches Diagram

Refer to the Operation Switches Diagram above. There is a replaceable

1 Amp Slow Blow 240V fuse (A) on the bottom rear of the water distiller head.
There are three grey control switches (B) and one overheat manual reset switch
(C) on the front of the water distiller head that allow you to control all functions of
the water distiller

Operation

NOTE: Read all parts of the Owners Guide before operating the
water distiller
. Follow the Before Initial Water Distiller Operation
steps and be sure to complete a Steam Sterilization of the Water
Distiller Head, Filter Canister and Storage tank before distilling
water for household use for the first time or after a period of
storage or non-use.

OFF

P

O

W

E

R

O

N

I

N

D

IC

A

T

O

R

L

IG

H

T

S

WATER FILLING

INDICATOR LIGHT

COOLING FAN

INDICATOR LIGHT

HEATING ELEMENT

INDICATOR LIGHT

Advertising