Ormal, Peration, Normal operation – Hydrotech Precision-PWS 8-5 OWNERS GUIDE User Manual

Page 31

Advertising
background image

31

1.

Ensure boiling and storage tank lids are in place and tight.

2.

Ensure all electrical plugs are properly connected and the water supply
valve is turned on.

3.

Turn the Power, Fan and Water switches to the ON position. Water will
enter the boiling tank, the heating element will energize and the cooling
fan will start.

4.

The water distiller will continue operating and distilling water until the
storage tank is full. At this time the water distiller will turn off until the
storage tank is drained to approximately 2/3 full and then the automatic
water distiller will start producing distilled water again.

5.

To prevent a build up of scale and contaminants in the boiling tank, it is
recommended that the impurities from the boiling tank be drained after
each distillation process or ten gallons of distilled water. Routinely
draining the impurities will prolong the life of the water distiller and reduce
cleaning.

Manual Drain Valve Location Diagram

6.

Refer to the Manual Drain Valve Location Diagram above. The water
distiller boiling tank can be drained by opening the ball valve and draining
into a suitable floor drain or container (valve is shown in the close
position). The drain may be operated automatically by installation of the
Optional Automatic Electric Drain System. See PWS AED-1 Automatic
Electric Drain Kit Installation
in the Optional Accessories Section for a
diagram of the kit and installation instructions

Normal Operation

TO SEWER

DRAIN ELBOW ASSEMBLY

GEAR CLAMP

TUBE

Advertising