Calibrate and verify the system, Install the sd system – Luminex 100 IS Version 2.3 User Manual

Page 192

Advertising
background image

Luminex 100 IS User Manual Version 2.3

x

MAP Technology

B - 10

PN 89-00002-00-072 Rev. C

‹

To install the Luminex XYP instrument reservoir:

1. On the Maintenance tab, click Eject/Retract to eject the plate

holder.

2. Insert the reservoir in the upper-right corner of the plate holder.

See Figure B-10.

Figure B-10 The XYP Instrument Reservoir

3. Click Eject/Retract to retract the plate holder.

Calibrate and Verify the
System

Run system calibration. See Calibration Procedures (page 5-46) to
complete the installation process by running the system calibrators
and controls.

Install the SD System

‹

To install the Luminex SD system:

1. After performing system calibration and the pressure has

stabilized, select Prime from the Home or Maintenance tab.
Then, at the Diagnostic tab, System Monitor section, record the
air and sheath pressure.

Air pressure: _______ psi.

Sheath Pressure: _______ psi.

Save this information. You will need it later in the installation
procedure and also if you return to the original sheath fluid and
waster bottle configuration.

2. At the end of the Prime cycle, disconnect the sheath fluid bottle.

Store it in a safe place. If you plan to use the Luminex SD
system waste line, disconnect the waste bottle. Connect the
system waste line to the instrument and insert the end into a large
waste container.

Advertising