Luminex 100 IS Version 2.3 User Manual

Page 194

Advertising
background image

Luminex 100 IS User Manual Version 2.3

x

MAP Technology

B - 12

PN 89-00002-00-072 Rev. C

Lower the stainless steel filter end of the sheath fluid line to
the bottom of a full 20 liter box of sheath fluid. Secure the
cap on the sheath fluid box. Place the sheath fluid container
so that the cap is on the top.

Attach the power cord to the input module on the back of the
Luminex SD system. Connect the P1 cable (PN 85-10011-
00-068) to the back of the SD and to P2 on the back of the
analyzer. Plug the power cord into the power outlet. See
Figure B-12.

Figure B-12 Back of SD System, P1 Port

4. Turn on the power to the Luminex SD system; the Luminex SD

system automatically primes itself. You hear the Luminex SD
system pump turn on. When the Luminex SD reservoir is about
2/3 full, it automatically stops priming.

5. Open the center access door on the Luminex 100 analyzer. Use a

screwdriver to turn the regulator fully clockwise. This typically
takes three to six full turns. Regulator is under arrow as Figure
B-13 shows.

Note:

Ensure that the sheath fluid

box is at least three feet below the
system, otherwise the Luminex SD
system will overfill.

Note:

The regulator must be fully

opened to work properly. It is
important to make sure that you
turn it as far as it will go.

Advertising