Power up, Getting started – GW Instek GLC-9000 User Manual User Manual
Page 41

GETTING STARTED
41
Power Up
Power Up
Press the power switch to turn
on the power. The system will
enter the measurement
interface after a quick
initialization.
GLC-9000
Max :
Min:
Name:
Class:
I
Network:
E
Wait for setting
…
Save
Recall
Hard
Copy
Network
Class
Leakage
Limit
System
AC+DC
Current
AUTO
Meas
AUTO
Range
14:58 2009.09.01
Leakage:
Enclo-Enclo
Probe:
T1/T2
Current :
Judge:
Lower limit:
OFF
Wait time:
120 sec
Upper limit:
12.00mA
Meas time:
220 sec
AC+DC
Current
clear
C
graph
G
Key unlock
Steps
1. Turn on the power switch. Ensure the EUT
power switch is off.
2. The GLC-9000 will load the last panel setting
before the last shut down.
3. Wait for the machine to warm up for 30
minutes before operating.
4. Check to see if the touch screen needs to be
calibrated. If so, see page 96 for details.