Badger Meter SRD/SRI Valve Positioners User Manual

Page 25

Advertising
background image

Preparing the Actuator
Screw the carrier bolt to the stem connector and lock it by means of a counter nut
A carrier bolt with an adjustable length is used to be able to screw on various coupling pieces

Figure 8: Carrier bolt

It consists of a stud S, which is screwed into the coupling piece K (with 3 mm Allen key) and locked with a lock nut M6 The

threaded sleeve H is screwed onto it and locked with a lock nut M6 Make sure that the bolt is adjusted to the right length!
Fasten the mounting bracket to the left side of the yoke For a cast yoke use a screw M8 x 30, for a pillar yoke use two U-bolts

and four nuts
Mounting the Positioner
Fasten the positioner to the mounting bracket using two spring washers and two screws M8 x 80
Note, the carrier bolt B is in the slot of the feedback lever A and the compensating spring F touches the carrier bolt

Figure 9: Feedback lever

For optimum use of the positioner operating range, it is recommended the arrangement be adjusted according to the

following procedure before fixing At an actuator position in the middle of travel range, the feedback lever position should be

perpendicular to the actuator stem and the angle range should be between −10…10° and −45…45°
Fasten the positioner to the mounting bracket so that a suitable angle range is selected
It is recommended that the pneumatic and electrical connections are made after adjusting the position

Mounting to Actuators

Page 25

August 2014

POS-UM-00010-EN-03

Advertising