Before starting the positioner, mount the SRD to the actuator; connect power and air supply The supply air connection must

have sufficient capacity and pressure of 1 4…6 bar (20…90 psig) and should not exceed the maximum operating pressure of

the actuator

NOTE:

N

Configuration using local keys or the communication interface may interfere with operation of the actual process!

During configuration it is recommended that there is no flow through the valve

M

DOWN

UP

Figure 22: Local keys

If there is no response using the local keypad (message 1 appears), make sure that the Write Protection is not set Remove the

write protection using the FDT/DTM configuration software
Indication with LEDs
The LEDs serve as indication in the following methods:

M

1

2

3

4

½ ½

-

-

-

M and LED 1 flash

1

constant light, ON

¼ flashing: short ON, long OFF
¾ flashing: long ON, short OFF
½ flashing: ON and OFF same duration

OFF

OPERATION

After Power ON

INIT: After power on of the input signal, or after reset, the SRD initializes, and the various components of the electronics are

checked and started (The stored data of the positioner not affected, and remains unchanged)
The current status is stated on the LCD in clear text or indicated as LED code
Initialization after positioner startup takes approx 3 sec, then the SRD goes
• Into operation (Autostart has already been done) or