NORD Drivesystems BU0040 User Manual

Page 44

Advertising
background image

NORDAC Control and Parameter Boxes

44

Subject to technical alterations

BU 0040 GB-0113

The SK 2xxE is installed with the following steps:

Step

Description

Illustration

1

Screw in the four hexagon-head spacer bolts into the four
threaded holes of the frequency inverter connection unit,
which are used to mount an SK TU4-xxx.

2

Fasten the mounting plate onto the spacer bolts with the
countersink screws.

NB: The countersink must be on the upper surface, so that
the countersink screws are flush with the surface after fitting..

3

Fasten the base housing of the SK SSX-3A to the mounting

plate with two cylindrical-head screws and lead the
connecting cable from the SK SSX-3A to the connection unit
of the frequency inverter.

Recommendation: Insert the cable via the bottom M16

opening using the enclosed cable gland.

4

Make the connections (see Section 3.1.2 and 3.1.3 )

Place the SK SSX-3A on the base housing and close it with

the four screws.

3.1.2

Connection


The Simple Setpoint Box provides various operating modes. The connection of the data or supply cables must be
made in different ways, depending on the required operating mode. Connection is made to the terminal bar by
means of a 3 or 4 wire cable. For a description of the terminal connections, please refer to Section 3.1.3 .

Connection data:

Name

Value

Rigid cable cross-section

0.14 … 2.5mm²

Flexible cable cross-section

0.14 … 1.5mm²

AWG standard

AWG 26-14

Tightening torque for screw
terminals

0.5…0.6Nm

The connection cable must be fed out of the device via a cable gland (supplied). The cable gland must be screwed
into the rear section of the housing.
It is recommended that the length of the connection cable is limited to 20 m. The cable should be laid separately
from other cables to avoid interference.

Advertising