Installing method in pue hy indicators – RADWAG HTY 60/H5/K Multifunctional Scales User Manual

Page 214

Advertising
background image

214

37.4.2. Installing method in PUE HY indicators

Module is designated for assembly inside indicator PUE HY. Module

is assembled to main board of indicator to 10-pin J3 connector. For

module WE8, there are installed two additional glands on the back wall

of the housing for leasing out 3m cables with insulation removed from

wires’ endings.


Installing procedure:

1. Unplug the indicator (remove the plug from socket 230V);

2. Unscrew the casing lid (back part of indicator casing);

3. Install the module in connector J3 on main board;

4. While installing module pay attention to plastic posts fastening

to main board. They should be placed in assembly holes in main

board and in assembly holes in module WE 8,

5. Led cable PT0166 through gland M20,

6. Connect the cable IN/OUT to joint J1, J2 for outputs and J3, J4 for

inputs on module 8IN/8OUT according to description given in table;

7. Assembly cover of indicator casing.

A WE 8 module placement on the main board of PUE HY

Advertising