Hose/cable pull chart -41, Table 4-1. hose/cable pull chart – JLG 1250AJP Service Manual User Manual
Page 281

SECTION 4 - BOOM & PLATFORM
3121171
– JLG Lift –
4-41
Figure 4-29. Tower Boom Powertrack Installation - Sheet 1 of 3
0273360-E
Table 4-1. Hose/Cable Pull Chart
Letter
Description
Dim. X
In.
Cm.
A
Platform Supply Hose
60
152
B
Platform Return Hose
7
18
C
Main Tele Extend Hose
7
18
D
Main Tele Retract Hose
7
18
E
Main Lift Extend Hose
60
152
F
Main Lift Retract Hose
60
152
G
Main Lift Pilot Hose
60
152
H
Tower Boom Control Cable
8
20
I
Tower Boom Sensor Harness
8
20
J
AC Cable
62
157
K
Weld Lead
62
157
L
7500W Generator (Optional)
62
157
M
Air Line (Optional)
62
157
NOTE: All X Dimensions are ± 1 in. (2.5 cm)
4.0 ± 0.5 in. (10 ± 1.2 cm)(
MAINTAIN HOSE/CABLE LOOP
AT THIS DIMENSION
6.0 ± 0.5 in. (15.2 ± 1.2 cm)(
MAINTAIN HOSE/CABLE LOOP
AT THIS DIMENSION
4.0 ± 0.5 in. (10 ± 1.2 cm)
5.0 ± 0.5 in. (12.7 ± 2.5 cm)
SEE DETAIL
A
SEE DETAIL
B
DETAIL
A
DETAIL
B