JLG 1250AJP Service Manual User Manual

Page 282

Advertising
background image

SECTION 4 - BOOM & PLATFORM

4-42

– JLG Lift –

3121171

0273360-E

Figure 4-30. Tower Boom Powertrack Installation - Sheet 2 of 3

SEE DETAIL

C

SEE DETAIL

E

DETAIL

E

DETAIL

C

BOOM SENSORS

CABLE

MAIN TELESCOPE CYL.

MAIN LIFT CYL.

PLATFORM SUPPLY

MAIN TELE CYL.

MAIN LIFT CYL.

MAIN LIFT CYL.

AIR LINE

ADJUST PUSHTUBE POSITION SO THERE

IS 0.250 ± 0.125 in. (0.635 ± 0.317 cm) CLEARANCE

BETWEEN PUSH TUBE AND POWERTRACK

ROLLER AT THIS LOCATION

USING CINCH STRAPS, MAKE

THREE SEPARATE BUNDLES AS FOLLOWS:
1. MAIN TELESCOPE EXTEND, RETRACT &

PLATFORM RETURN HOSES.

2. PLATFORM SUPPLY AND (3) MAIN LIFT

CYLINDER HOSES.

3. ALL OTHER CABLES & AIR LINE THAT

ARE ROUTED THROUGH MAIN BOOM CLAMP.
STRAPS ARE TO BE LOCATED AT 6.000 ± 1.000

(15.2 ± 2.5 cm) & 16.000 ± 1.000 in. (40.64 ± 2.54

cm) FROM TOWER FLY BOOM HOSE LOOP.

PLATFORM RETURN

PLATFORM

CONTROL

CABLE

MAIN TELE CYL.

MAIN TELE CYL.

MAIN LIFT CYL.

PLATFORM RETURN

MAIN LIFT CYL.

PLATFORM SUPPLY

AIR LINE

MAIN LIFT CYL.

GENERATOR CABLE

OR WELD LEAD

GENERATOR CABLE

OR WELD LEAD

ELECTRICAL CABLES

ROUTE HOSES THROUGH POWERTRACK

SEPARATOR BARS AS SHOWN BELOW

ROUTE HOSES THROUGH PUSH TUBE

TUBES AS SHOWN BELOW

ROUTE HOSE/CABLE BUNDLE

THROUGH HOSE LOOP ON

TOWER FLY BOOM AS SHOWN

Advertising