JLG 1250AJP Service Manual User Manual

Page 504

Advertising
background image

SECTION 6 - JLG CONTROL SYSTEM

6-72

– JLG Lift –

3121171

9. Once the “CHECKING BOOM…” testing is complete

and the test passes the control system will clear the
Tower Event log and clear the “BCS VIOLATION –
BOOM LOCKED” fault flag. The screen will read:

10. Once “ENTER”

is pressed on either one of the

“CHECK FAILED” or “CHECK PASSED” states the
control system will Prompt for “MAIN DWN TO
STOP” and enable all hydraulic functions.

11. Once the Main boom transport angle switch indi-

cates it is below elevation the Analyzer will display
“TWR DWN TO STOP”.

12. Once the Tower Boom is below elevation the Ana-

lyzer will display “TEST COMPLETE”.

Advertising