Linkconnect and echoconnect control wiring, Ul 924 listed panic input, N o t e – ETC Unison DRd Dimming Rack Enclosure User Manual

Page 39

Advertising
background image

4

Terminate Wiring

35

LinkConnect and EchoConnect Control Wiring

Control stations communicate with the Architectural Control Processor using the

LinkConnect or EchoConnect station communication bus from the Architectural Control

Processor to the stations.

Termination is available for up to six home runs of LinkConnect / EchoConnect data runs

utilizing Belden 8471 cable (or approved equal) plus one 14 AWG (2.5mm

2

) ESD drain

wire. This wiring is topology-free and can be installed in any combination of bus, star, loop,

and home run. The total combined length of all wire runs cannot exceed 1,640 feet (500m).

Step 1:

Pull Belden 8471 (approved equal) control wiring and a 14 AWG ground into the

enclosure through the conduit opening previously prepared.

Step 2:

Strip 3/16” (5mm) of insulation from the ends of each wire pair.

Step 3:

Remove the EchoConnect/ LinkConnect (LON) connector from the right I/O

board.

Step 4:

Loosen the terminal screws for as many wire pairs you are terminating.

Step 5:

Insert each white wire (typical) from the pairs into a “B” terminal on the connector

and tighten the screws firmly to secure the wire into the connector.

Step 6:

Insert each black wire (typical) from the pairs into an “A” terminal, next to the

previously installed “B” terminal on the connector and tighten the screws firmly to

secure the wire into the connector.

Step 7:

Terminate the 14 AWG (2.5mm

2

) ground wire to the DRd ground bus bar in the

rear of the enclosure.

Step 8:

Replace the connector to the right I/O board.

UL 924 Listed Panic Input

Termination is available for a UL 924 Listed dry contact input for

control bypass. The two pin panic connector, labeled “PANIC”,

accepts 16 AWG (1.5mm

2

) wire. Reference the related

Architectural Control Processor Configuration Manual for panic

look setup.

Step 1:

Pull panic wiring into the enclosure through the conduit

opening previously prepared.

Step 2:

Strip 3/16” (5mm) of insulation from the ends of each

wire.

Step 3:

Remove the 2 pin Panic connector from the right I/O board.

Step 4:

Loosen the terminal screws.

Step 5:

Insert each wire into the terminals on the connector and tighten the screws firmly

to secure the wires into the connector.

Step 6:

Replace the connector to the right I/O board.

N o t e :

While the wiring for LinkConnect in SmartLink and Paradigm and EchoConnect for

Echo systems are similar, the communication and control types are not

interchangeable. Each product family requires a dedicated station infrastructure

that cannot be shared.

N o t e :

It is required that you terminate LinkConnect / EchoConnect station wiring and the

auxiliary power wiring in the same enclosure (rack 1) where the station power

module and architectural control processor will be installed.

HRU

/B

ATT

J9
DUAL RACKS

WER /

CDI

COM

PANIC