Reengage module retention bar – ETC Unison DRd Dimming Rack Enclosure User Manual

Page 59

Advertising
background image

6

Final Installation and Power Up

55

Reengage Module Retention Bar

Step 1:

Check that all required modules have been installed into the DRd enclosure including

dimmer modules, air flow modules, Station Power Module, and Architectural Control

Processor. All module slots should be populated.

Step 2:

Loosen the screws on the retention bar.

Step 3:

Slide the retention bar to the right. Notice the retention bar has two tabs that insert into
the ACP and Station Power Module slots for retention.

Step 4:

Secure the retention bar in place using the screws provided.

Enclosure door removed

from graphic only for

clarity of the dimmer

module retention

installation.

Dimmer module

retention bar

Advertising