First Operation Check

iina

74

e 0

3

.f

m

te

chn

ica

l ha

nd

boo

k

(1

40

8)

3.2.2

Internal Calibration

9

Proceed the internal calibration (See Chapter

7.2.1

Internal Calibration

). For better

quantitative measurements please allow the unit to warm up (15 … 20 minutes).

Press

Calibration

(Soft Key no. 5

Fig. 3-2

/8) to get into the calibration menu.

Select internal (Soft Key no. 4

Fig. 3-2

/5) to choose the internal calibration.

Select automatic (Soft Key no. 8

Fig. 3-2

/11). The automatic procedure of the

internal calibration is started and takes about 30 seconds.

10

Press the

STOP Button

Fig. 3-2

/13 until the message STAND-BY / VENTED appears

on the display. The inlet is vented now.

3.2.3

Verification

To verify the accuracy please proceed through the following steps. A test leak is
required. If a test leak is not available please continue with #16.

11

Remove the blind flange from the inlet port and connect the open helium test leak to

the inlet port.

12

Press the

START Button

Fig. 3-2

/6 again. The inlet will be evacuated and the leak

rate of the test leak will be measured and displayed.

13

Press the

STOP Button

Fig. 3-2

/13 to interrupt the measurement. The Stand-by

mode will be displayed.

14

Press the

STOP Button

Fig. 3-2

/13 again until the message STAND-BY vented

appears an the display. The inlet is vented now.

15

Remove the helium test leak from the inlet port and put a blind flange onto the inlet

port again.

16

Switch off the leak detector by using the mains switch

Fig. 2-6

/8.

The first operation is finished.