2.2.4 Edit Deposition

18

Select the Deposit tab. See

Figure 2-6

.

Figure 2-6 Deposit tab

19

Set gain (P Term) to 55.

20

Set time constant (I Term) to 0.7.

21

Set dead time (D Term) to 0.

22

Be sure Shutter Delay Enabled is not selected.

23

Set Rate Sampling to Continuous.

2.2.5 Edit Pre/Post Conditioning

24

Before deposition begins, the source material is often brought to a ready state
by slowly raising the evaporation source power. Select the Condition tab and
set each parameter to the values shown in

Figure 2-7

.