Before initial switch-on

_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

6

Commissioning

During commissioning, system-related data such as motor parameters, operating parameters,

responses, and parameters for fieldbus communication are defined in the inverter. For Lenze

devices, this is done by means of codes.
The codes of the inverter and for communication are saved to the memory module in a non-volatile

data set.
In addition, there are codes for diagnosing and monitoring the stations.

Parameter reference

( 53)

6.1

Before initial switch-on

Note!

When parameterising the communication module, please note that the code number

depends on the slot of the standard device into which the communication module is

plugged.
The first two digits of the code number indicate the slot:

• C13nnn for slot MXI1

Parameters of the communication module for slot MXI1

( 55)

• C14nnn for slot MXI2

Parameters of the communication module for slot MXI2

( 63)

You also have to set the

Parameters of the standard device that are relevant to

communication

( 53)

.

Stop!

Before switching on the Servo Drive 9400 and the communication module for the first

time, check the entire wiring for completeness, short circuit and earth fault.