1 preface and general information, 1 how to use these operating instructions, 1 terminology used – Lenze 2131IB User Manual

Page 5: 2 what is new, 2 scope of supply, How to use these operating instructions, Terminology used, What is new, Scope of supply, Preface and general information

Advertising
background image

Preface and general information

1-1

BA2131EN

1

Preface and general information

1.1

How to use these Operating Instructions

l

These Operating Instructions are intended for safety-relevant operations on and with the 2131
fieldbus module. They contain safety information which must be observed.

l

All personnel working on and with the 2131 fieldbus module must have these Operating
Instructions available and observe the information and notes relevant for them.

l

The Operating Instructions must always be complete and perfectly readable.

These Operating Instructions inform about the most important technical data and the installation of
the 2131 fieldbus module. They are only valid in combination with the Operating Instructions of the
corresponding controller.

1.1.1

Terminology used

Controller

In the following, the term ”controller” is used for ”93XX servo inverters” or ”82XX frequeny inverters”.

Drive system

In the following, the term ”drive system” is used for drive systems with fieldbus modules or other Lenze drive
components.

Fieldbus module

In the following text, the term ”fieldbus module” is used for the fieldbus module type 2131 PROFIBUS.

Cxxx/y

Subcode y of code Cxxx (z.B. C0410/3 = subcode 3 of code C0410)

L-Cxxx/y

Lenze code

Xk/y

Terminal strip Xk/terminal y (z.B. X3/28 = terminal 28 on terminal strip X3)

(

ž

xx-yyy)

Cross reference (chapter - page)

1.1.2

What is new?

Ident. no.

Edition of

Important

Contents

394 179

27/01/1997

Format change to DIN A4

408822

01/06/1999

replaces 394 179

l

Adaptation to 8200 vector (all chapters)

1.2

Scope of supply

Scope of supply

Important

l

1 2131 fieldbus module with housing (enclosure IP20)

l

1 M3 fixing screw
1 two pole male connector for voltage s pply

After the delivered received, check immediately whether the items
supplied match the accompanying papers. Lenze does not accept any
liability for deficiencies claimed s bseq ently

l

1 two-pole male connector for voltage supply

l

1 diskette with:

– a) Controller master file to DIN E 19245 part 3 (L AR00AA.GSD)

liability for deficiencies claimed subsequently.
Claim

l

visible transport damage immediately to the forwarder

f

– a) Controller master file to DIN E 19245 part 3 (L_AR00AA.GSD)
– b) Controller type files for

Simatic-S5 COM-ET200 V4.X (LE00AATD.200)
Simatic-S5 COM-ET200 V5 X (LE00AAAX 200)

p

g

y

l

visible deficiencies/incompleteness immediately to your Lenze
representative.

Simatic-S5 COM-ET200 V5.X (LE00AAAX.200)

– c) Example program for Simatic-S5 (2130IBST.S5D)

l

1 Short Instructions

Show/Hide Bookmarks

Advertising