Commissioning

5-1

BA2112EN

5

Commissioning

Stop!

Before switching on the mains voltage, check the wiring for completeness, earth fault and
short circuit.

Keep to the switch-on sequence! (Chapters 5.1 to 5.4)

5.1

Configuration of the host for communication with the 2112
fieldbus module

With INTERBUS-Loop the master does not have to be configured. Please observe that a 4th
generation master is used for the communication between host and 2112 fieldbus module.

5.2

Commissioning of 2112 fieldbus modules

1. Plug the 2112 fieldbus module into the front automation interface (AIF) of the controller (see

Operating Instructions for the controller)

2. Supply INTERBUS-Loop terminal (see Fig. 4-2, pos. 2.2) with voltage.

– The green LED for voltage supply (

(

›

4-1)

pos.1) must be on or blinking.

– An internal initialization between controller and 2112 fieldbus module follows as soon as the

fieldbus module is connected to the controller. The initialization time is up to 3s.

3. Initialization is completed when

– the green LED (

(

›

4-1)

, pos. 1) is on permanently

4. Activate INTERBUS

– the yellow bus LED is on permanently

5. It is now possible to communicate with the drive.

If the LED is not on or blinking, see chapter 7 ” Troubleshooting and fault elimination” .

Tip !

(If the DRIVECOM-Profile (C0009

11, 12

(

›

5-4)

) is selected under C009)

When attaching the fieldbus module to the 93XX controller, the controller is inhibited and the
DRIVECOM status switch-on inhibit is set. For enabling the controller, the status OPERATION
ENABLE must be set once with the DRIVECOM control word.

(

›

5-3)

. Afterwards, the controller

can be controlled as usual, e.g. via terminals.