2 inserting further subelements, 3 copying and inserting different nodes, Plc designer v2.x| lenze application samples – Lenze PLC Designer V2.x User Manual
Page 230

PLC Designer V2.x| Lenze Application Samples
Adding other components
Inserting further subelements
230
L
1.3 EN - 07/2012
9.2
Inserting further subelements
Alternatively you can add further nodes via the context menu (right mouse button) of the
CAN master, Add subelement<Node> command.
[9-3]
Adding further nodes
The functionality enhancement has to be carried out manually for each node.
9.3
Copying and inserting different nodes
If the CAN bus is to be extended by nodes which are not available in the example, this can
only be effected via the list, as described in the following section:
Via the ProjectCopy tab, the control configuration can be copied from a different project
to the project to be edited. Afterwards, it has to be adapted manually for the node to be
controlled.