System Settings

7

Start Schedule

Starts the scheduled measurement(s).

The Scheduler active window is displayed.

Scheduling - Getting Started

After starting the scheduled measurement, the XL2 waits for
the next scheduled start date and time. The instrument buttons
are disabled.

Power Supply

It is recommended that the instrument remains powered on
until the next start time, using the accessory mains power
adapter. If the XL2 is powered off and on again during this time,
then the XL2 Analyzer restarts in the Scheduler function and
continuous the countdown. This applies also for any interrup-
tion of mains power supply.

Stopping the Schedule

Press and hold the escape button

to stop the schedule.

Operation with PC

Starting the schedule switches the USB interface automatically
into the COM port mode for remote measurement applications
or using the XL2 Projector software.