‎Chapter 2 Installation

Site

R E Q U I R E M E N T S

18

PM130 PLUS Powermeter Series

Chapter 2 Installation

This chapter discusses the following types of physical installations for the
PM130 PLUS Powermeter:

Mechanical Installation

Electrical Installation

I/O Connections

COM Port Connections.

2.1 Site Requirements

Environmental conditions: as specified in Technical Specifications
in Appendix A

Electrical requirements: as specified in Technical Specifications in
Appendix A

See

Technical Specifications

in Appendix A for more details

2.2 Package Contents

The PM130 PLUS Powermeter package contains the following items:

PM130 PLUS Powermeter unit

Technical Documentation CD

Optional accessories (depending on the options ordered, if any)

Cables