Table 20 – SATEC PM130 PLUS Manual User Manual

Page 72

Advertising
background image

‎Chapter 5 Configuring

T H E P M 1 3 0 P L U S

General

M E T E R S E T U P

72

PM130 PLUS Powermeter Series

Display

Label

Parameter

Options

Default

Description

nd.P

The number of

blocks in the sliding
demand window

E, EH

1-15

1

The number of blocks to be

averaged for sliding window

demands

Ad.P

Volt/Ampere

Demand Period

0-1800 sec

900 sec The length of the demand period

for ampere and volt demand

calculations

1. Always specify the wiring mode and transformer ratings prior to
setting up setpoints and analog outputs.

2. The maximum value for the product of the phase CT primary
current and PT ratio is 57,500,000. If the product is greater, power
readings are zeroed.

Figure ‎5-6: General Setup Dialog Box – Basic Setup Tab

Table 20 lists the available wiring modes.

Table 20: Wiring Modes

Wiring Mode

Description

3OP2

3-wire Open Delta using 2 CTs (2 element)

4LN3

4-wire Wye using 3 PTs (3 element), line-to-neutral voltage readings

3DIR2

3-wire Delta Direct Connection using 2 CTs (2 element)

4LL3

4-wire Wye using 3 PTs (3 element), line-to-line voltage readings

3OP3

3-wire Open Delta using 3 CTs (2½ element)

3LN3

4-wire Wye using 2 PTs (2½ element), line-to-neutral voltage

readings

Advertising