Wiring diagrams – SATEC PM135 Manual User Manual

Page 25

Advertising
background image

‎Chapter 2 Installation

Electrical Installation

PM135 Powermeter Series

25

In case of a retrofit application where each external CT ends with two
wires:

1. Pass one wire through the meter CT

core.

2. Connect the wire to one of the

meter termination screws.

3. Connect the second wire from the

external CT to the termination screw
to close the loop.

Figure ‎2-8. Current Input Connection

Wiring Diagrams

For AC input ratings, see

Technical Specifications

in Appendix A for more

details.

Table 2 presents the available wiring configurations in the meter. For
more details, see

Basic Meter Setup

in Chapter 5.

Table 2: Wiring Configurations

Wiring Configuration

Setup Code

Figure

3-wire 2-element Delta direct connection using 2 CTs

3dir2

2-8

4-wire 3-element Wye direct connection using 3 CTs

4Ln3 or 4LL3

2-9

4-wire 3-element Wye connection using 3 PTs, 3 CTs

4Ln3 or 4LL3

2-10

3-wire 2-element Open Delta connection using 2 PTs, 2 CTs

3OP2

2-11

4-wire 2½-element Wye connection using 2 PTs, 3 CTs

3Ln3 or 3LL3

2-12

3-wire 2½-element Open Delta connection using 2 PTs, 3 CTs

3OP3

2-13

4-wire 3-element Delta direct connection using 3 CTs

4Ln3 or 4LL3

2-14

3-wire 2½-element Broken Delta connection using 2 PTs, 3 CTs 3bLn3 or 3bLL3

2-15

Advertising