4 setting up the meter, Preparing setups for the meter, Setting up the meter – SATEC PM135 Manual User Manual

Page 66

Advertising
background image

‎Chapter 4 Using PAS Software

Setting Up the Meter

66

PM135 Powermeter Series

connection before announcing an
error.

Figure ‎4-4: Configuration Dialog Box – Connection Tab

6. In the Retries box, specify the

number of retries PAS will use to
receive a response from the meter if
communications fail.

7. Click OK.

4.4 Setting Up the Meter

Preparing Setups for the Meter

PAS allows you to prepare setup data for your meter off-line without the
need to have it connected to your PC.

To prepare a setup for your meter:

1. Select the device site from the list

box on the PAS toolbar.

2. Select the desired setup group from

the Meter Setup menu. Click on
the tab with the setup you want to
create or modify.

3. Fill in the boxes with the desired

configuration data for your meter.

4. Click the Save as… button to store

the data to the meter site database.

5. Click OK.

Always set up and store the Basic Setup data to the site
database first. PAS uses this data as a reference when
arranging other meter setups.

To save your setup to another site database:

1. Click the Save as… button.

Advertising