background image

‎Chapter 5 Configuring the PM135

Configuring Communications

72

PM135 Powermeter Series

2. Selecting

the

DNP3

protocol

launches the second DNP3 TCP
server in addition to the MODBUS
server

allowing

simultaneous

connections on both ports. Selecting
the MODBUS protocol disables the
DNP3 TCP server.

3. When you change the COM2

settings through the Ethernet port,
the

device

port

restarts

so

communications will be temporarily
lost. You may need to wait some
additional time until PAS restores a
connection with your device.

Setting Up Ethernet

Using the Front Display

Select Network Setup from the Device Setup menu. This menu entry
appears only if the optional Ethernet module is plugged into the
meter.
It allows you to set up the meter network address and the default
gateway.

See

Viewing and Changing Setup Options

in Chapter 3 for information on

configuring parameters via the front display.

Device Setup

Real Time Clock
Display Setup
Basic Setup
Device Options
COM1 Setup
COM2 Setup

Network Setup


Using PAS

Select Communications Setup from the Meter Setup menu, and then
click on the Network Setup tab.