3 setting up communications, Setting up communications – SATEC PM135 Manual User Manual

Page 63

Advertising
background image

‎Chapter 4 Using PAS Software

Setting up Communications

PM135 Powermeter Series

63

Figure ‎4-1: Configuration Dialog Box – Instrument Setup Tab

2. Click the Sites button on the right-hand-side.

3.

From the Look in box, select the directory where a

new database will be stored. By default, it is the Sites
directory.

4.

Type a site name for your device in the File name

box, click New, and then click OK.

5.

On the Instrument Setup tab, select PM135 in the

Model box. PAS automatically selects the appropriate
instrument options for your meter.

6.

Select a correct CT secondary current (5A or 1A) for

your meter.

7.

If you wish to add any comments for your meter, type

the comments in the Comment box.

4.3 Setting up Communications

You can communicate with the PM135 via a PC RS-232 serial port or
through the Internet.

To configure communications with the PM135:

Advertising