SATEC PM135 Manual User Manual

Page 79

Advertising
background image

‎Chapter 5 Configuring the PM135

General Meter Setup

PM135 Powermeter Series

79

Parameter

Options

Default

Description

Volt/Ampere

Demand Period

0-1800 sec

900 sec The length of the demand period

for ampere and volt demand

calculations

1. Always specify the wiring mode and transformer ratings prior to
setting up setpoints and analog outputs.

2. The maximum value for the product of the phase CT primary
current and PT ratio is 57,500,000. If the product is greater, power
readings are zeroed.

Figure ‎5-6: General Setup Dialog Box – Basic Setup Tab

Table 9 lists the available wiring modes.

Table 9: Wiring Modes

Wiring Mode

Description

3OP2

3-wire Open Delta using 2 CTs (2 element)

4LN3

4-wire Wye using 3 PTs (3 element), line-to-neutral voltage readings

3DIR2

3-wire Delta Direct Connection using 2 CTs (2 element)

4LL3

4-wire Wye using 3 PTs (3 element), line-to-line voltage readings

3OP3

3-wire Open Delta using 3 CTs (2½ element)

3LN3

4-wire Wye using 2 PTs (2½ element), line-to-neutral voltage

readings

3LL3

4-wire Wye using 2 PTs (2½ element), line-to-line voltage readings

3BLN3

3-wire Broken Delta using 2 PTs, 3 CTs (2½ element), line-to-neutral

voltage readings

3BLL3

3-wire Broken Delta using 2 PTs, 3 CTs (2½ element), line-to-line

voltage readings

In 4LN3, 3LN3 and 3BLN3 wiring modes, Min/Max volts, volt
demands and voltage harmonics represent line-to-neutral

Advertising