3 - gate amplifier installation and wiring, Prepare for installation, Operating temperatures – Rockwell Automation 23P PowerFlex DC Stand Alone Regulator and Gate Amplifier User Manual

Page 41: Chapter 3, Gate amplifier installation and, Wiring, Prepare for installation operating temperatures, For mor, Gate amplifier installation and wiring

Advertising
background image

Rockwell Automation Publication 23P-UM001D-EN-P - July 2012

41

Chapter

3

Gate Amplifier Installation and Wiring

Prepare for Installation

Prior to installation of the Gate Amplifier read the

General Precautions on

page 9

.

Operating Temperatures

The surrounding air temperature must be within 0

° C to 50 ° C (32 ° F to 122

° F). Humidity must remain between 5% and 95% non-condensing.

Advertising