Rockwell Automation 20D PowerFlex 700H to 700S Phase II Control Conversion (Frames 9...14) User Manual

Page 39

Advertising
background image

39

Publication 20C-IN001D-EN-P

3. Connect the twisted pair wires from connector J1 on the 24V Common Mode

Filter board to connector J5 on the High Power Fiber Optic Interface board.

4. Connect the 24V power supply cable from connector J8 on the Voltage

Feedback board to connector J5 on the 24V Common Mode Filter board.

5. Continue with Step 8 “Connecting I/O and Communications” on page

page 40

.

24V Supply cable to J8 on Voltage

Feedback circuit board

J5

J1

J5

Advertising
This manual is related to the following products: