Overview, Selecting and integrating an ip00 system – Rockwell Automation 20G PowerFlex 755 IP00 NEMA/UL Open Drive - Frames 8-10 User Manual

Page 4

Advertising
background image

4

Rockwell Automation Publication 750-IN020C-EN-P - May 2012

PowerFlex 755 IP00, NEMA/UL Open Type Drive

Overview

Selecting and Integrating an IP00 System

The following steps will guide you in planning and installing a PowerFlex 755
IP00, NEMA/UL Open Type drive.

1. Considerations

❏ Drive size (Hp & V AC), required accessories/options (HIM, comms, etc.)
❏ Ingress protection of system
❏ Mounting orientation of drive
❏ Cooling method, venting orientation, alignment of venting
❏ Control pod mounting location
❏ Cabling entry/exit scheme and cable routing provisions
❏ Roll-out cart required
❏ Personnel safety and necessary tooling

2. Selection

❏ Select and purchase enclosure with sub-panel and ingress accessories (page

16

)

❏ Select and purchase drive and corresponding drive options (see

750-TD001

)

❏ Select and purchase pod and corresponding cables (page

10

or page

14

)

❏ Select and purchase field termination kits (page

10

or page

14

)

❏ Select and purchase appropriate mounting kits (drive mounting & floor - page

10

or page

14

)

❏ Select and purchase door fans (pages

20

21

)

❏ Select and purchase necessary wire and cabling (pages

45

&

59

)

3. Prepare the Enclosure

❏ Create ventilation openings, mount door fans (pages

17

21

)

❏ Provisions for accessories (HIM cradle, etc. - see

750-TD001

)

❏ Fabricate and mount inlet and outlet plenums (pages

17

19

)

❏ Drill sub-panel(s) (page

39

& page

40

)

❏ Mount field termination kit, mounting brackets, and floor kit (page

39

& page

40

)

❏ Mounting of customer specified accessories
❏ Remote mounting of control pod (if specified - see

750-IN015

)

❏ Mount sub-panel(s)

4. Power and Ground Wiring

❏ Ensure proper grounding (page

45

)

❏ Position & secure movable L-brackets (page

49

)

❏ Properly terminate power cables (page

48

)

❏ Attach power cabling (page

48

)

5. Roll-in and Secure the Drive Unit

❏ Raise drive unit to vertical orientation (page

37

)

❏ Position roll-out cart (see

750-IN001

)

❏ Lift drive unit onto cart (see

750-IN001

)

❏ Roll drive unit into cabinet and secure (see

750-IN001

)

6. Control Wiring

❏ Mount control pod into drive (if specified - page

42

)

❏ Verify control transformer voltage (page

41

)

❏ Ensure proper cable routing (page

58

)

❏ Attach pod power and fiber optic cables (page

58

)

❏ Install real time clock battery and HIM cable (page

60

)

❏ Install remaining control wiring (pages

59

66

)

❏ Verify correct torque on all fasteners and connectors

7. Commission the System