Metering demand results, Table a.12 – Rockwell Automation 1404-M4_M5_M6_M8 Powermonitor 3000 User Manual, PRIOR to Firmware rev. 3.0 User Manual
Page 194

Publication 1404-UM001D-EN-E - October 2004
A-20 Powermonitor 3000 Data Tables
Table A.12 Metering Demand Results
CSP File No.
F18
Remote I/O BT
25
CIP Assy. Inst.
17
No. of Elements
10
User Configurable No
Data Type
Floating point
Data Access
Read only
PM3000 Type
All
Element
No.
Modbus
Address
Element name
Units
Range
Comment
0
30401-02
Demand Current
Amps (A)
0.0 to 999.9x10
21
Refer to Energy Results on page 3-8.
1
30403-04
Demand Power
Watts (W) 0.0 to 999.9x10
21
2
30405-06
Demand Reactive Power
VAR
0.0 to 999.9x10
21
3
30407-08
Demand Apparent Power
VA
0.0 to 999.9x10
21
4
30409-10
Projected Demand I
Amps
0.0 to 999.9x10
21
Refer to Projected Demand Calculation on page 3-10.
5
30411-12
Projected Demand W
Watts
0.0 to 999.9x10
21
6
30413-14
Projected Demand VAR
VAR
0.0 to 999.9x10
21
7
30415-16
Projected Demand VA
VA
0.0 to 999.9x10
21
8
30417-18
Elapsed demand period time
Minutes
0.0 to 999.9x10
21
The time elapsed within the current demand period.
9
30419-20
Metering iteration
-
0 to 32767
Increments by 1 to 32767, rolls over to 0