6 glp test for exchange unit and dosing unit, Glp test for exchange unit and dosing unit, Figure 18 – Metrohm 916 Ti-Touch User Manual

Page 82: Exchange unit – tubing connections

Advertising
background image

8.6 GLP test for exchange unit and dosing unit

■■■■■■■■■■■■■■■■■■■■■■

66

■■■■■■■■

916 Ti-Touch

1

2

3

Figure 18

Exchange unit – tubing connections

1

Tubing to the reagent bottle

2

Tubing to the dosing tip

3

Tubing to the dosing cylinder

8.6

GLP test for exchange unit and dosing unit

Titrant: Edit

Dosing unit / Exchange unit GLP test

In the dialog Exchange unit / GLP test or Dosing unit / GLP test,
respectively, you can define the time interval after which a GLP test must
be carried out again for the exchange unit or dosing unit.

GLP test date

Date on which the last GLP test was carried out.

Format: YYYY:MM:DD

Monitoring

on | off (Default value: off)

If this parameter is activated, then the time interval after which a GLP test
has to be carried out again will be monitored.

Advertising