Rotary dial address mode, Step 3 - powering the node, Step 4 - verify communications, gateway and node – Banner SureCross DX80 Wireless Networks User Manual

Page 111: Step 5 - site survey, Line powered node pinout diagram, Gateway or gatewaypro, Node

Advertising
background image

111

Banner Engineering Corp. • Minneapolis, MN U.S.A.

www.bannerengineering.com • Tel: 763.544.3164

SureCross Wireless Network

Product Manual

Rotary Dial Address Mode

Line Powered Node Pinout Diagram

Wire No.

Color

Description

1

Brown

10–30V dc Input

3

Blue

dc common (GND)

Step 3 - Powering the Node

To apply power to the Node, connect the 10–30V dc cable or DX81 Battery Module as shown. As soon as power is applied to the Node, the

LCD displays POWER and begins cycling through the I/O points on the Node.

Step 4 - Verify Communications, Gateway and Node

Gateway or GatewayPro

Verify LED 1 is on and green. The image shown is a Gateway. The GatewayPro has no side glands.

Status

LED 1

LED 2

Power ON

Green ON

System Error

Red Flash

Red Flash

Modbus Communication Active

Yellow Flash

Modbus Communication Error

Red Flash

Node

Verify LED 1 is flashing green and LED 2 is off. Until communication is established with the Gateway, the Node’s
LED 2 flashes red. When communication is established, the Node’s LED 1 flashes green. Nodes will not sample
inputs unless they are in sync with a Gateway.

Status

LED 1

LED 2

System Error

Red Flash

Red Flash (1 per sec)

RF Link Ok

Green Flash (1 per sec)

RF Link Loss

Red Flash (1 per 3 sec)

If testing the Gateway or GatewayPro and Node before installation, verify the Gateway device and Node are at least two meters apart or the
communications may fail.

In a Gateway and Bridge system, Active Modbus communications refers to the communication between the Gateway and the Ethernet Bridge.
In a GatewayPro system, the Modbus communication LED refers to the communication internal to the GatewayPro. In a Gateway only system,
the Modbus communication LED refers to the communication between the Gateway and the host system.

Step 5 - Site Survey

Running Site Survey is optional. Site Survey analyzes the radio signal between a Gateway (or GatewayPro) and a specified Node, reporting
the number of data packets missed or received. To ensure reliable communication, perform the Site Survey before permanently installing your
network. Only the Gateway can perform a Site Survey analysis.
Refer to the Site Survey section for detailed instructions about how to conduct a Site Survey and how to interpret the results.

Advertising