Step 4: verify communications, Basic setup, On the gateway – Banner SureCross DX80 Wireless Networks User Manual

Page 19: On the node

Advertising
background image

19

Banner Engineering Corp. • Minneapolis, MN U.S.A.

www.bannerengineering.com • Tel: 763.544.3164

SureCross Wireless Network

Product Manual

Basic Setup

Step 4: Verify Communications

On the Gateway

Verify LED 1 is on and green.

On the Node

Verify LED 1 is flashing green and LED 2 is off. Until communication is established with the Gateway, the Node’s
LED 2 flashes red. When communication is established, the Node’s LED 1 flashes green.
A Node will not sample its inputs until it is in sync with a Gateway.

LED 1

LED 2

Gateway Status

Node Status

Green ON

Power ON

Green flash (1 per sec)

RF Link Ok

Yellow Flash

Modbus Communication Active

Red Flash

Modbus Communication Error

Red Flash

Red Flash

System Error

System Error

Red flash (1 per 3 secs)

RF Link Error

When testing the Gateway and Node before installation, verify the Gateway and Node are at least two meters apart or the communications may
fail.

Advertising